RAIL TO RIVER TRANSIT CORRIDOR
Client: LA County Metro
TEAM MEMBERS
Cityworks Design (Prime)
Fehr + Peers
Hunt Design
Illuminate Lighting Design
KPFF Engineers
Lenax Construction Services, Inc.
Lyric Design & Planning
STV Inc.
Terry A. Hayes Associates, Inc.
In collaboration with: Jeannie Olander Design Inc. & Yunsoo Kim Design
Cityworks Design led a team that designed and developed 30% documents for Segment A of Metro's first dedicated active transportation corridor project (2016-2017). This 6.4-mile bikeway and walking path is located in the heart of South LA and utilizes Metro's Harbor Subdivision rail ROW and city streets. The 12-month design effort involved several cities and historic neighborhoods through an intensive outreach program. The design work was accelerated in order to retain significant TIGER grant funding. When completed, Segment A will connect the Crenshaw Line (Fairview Heights Station) with the Blue Line (Slauson Station). In subsequent phases, the project will eventually connect with the LA River bike path. Lisa Padilla provided design and management leadership for the team, and collaborated with other firms for civil engineering, lighting, signage, traffic, cost estimating and outreach. Construction is anticipated to begin in late 2021 or early 2022.